AI4E PRODUCTS & CAPABILITIES

Cross-domain engineering AI, built from reusable components以可重用組件構建跨領域工程人工智能

Monitoring, inspection and survey data are rich but fragmented; the hard problem is a defensible priority order. Three capabilities — predict, see, understand — answer it.監測、檢查及測量數據豐富卻分散,難點在於建立有依據的優先次序。預測、感知及理解三項能力,正是解決這個問題的方法。

CAPABILITIESONE METHOD STACK

PREDICT預測

Failure and time-to-event失效及事件發生時間

  • Survival analysis on asset histories and event logs基於資產歷史及事件記錄進行存活分析
  • Precursor signals in pressure and flow telemetry識別壓力與流量遙測中的前兆訊號
  • Calibration and drift checks before any claim在作出判斷前進行校準及漂移檢查

SEE感知

Geospatial change地理空間變化

  • Repeat drone surveys registered across epochs對不同時期的重複無人機測量進行配準
  • Vegetation filtered; ground movement retained過濾植被,保留地面位移
  • Corridor context with confidence, not a heat map提供附置信度的沿線分析,而非僅呈現熱力圖

UNDERSTAND理解

Vision, BIM, documents視覺、BIM 及文件

  • Defect imagery triaged before engineer review工程師審核前,先對缺陷影像分流
  • Asset context tied to the spatial record將資產背景與空間記錄連結
  • Controlled search with traceable citations提供附可追溯引用的受控搜尋
Intelligent Infrastructure Asset Dashboard智能基礎設施資產儀表板
Infrastructure asset geospatial platformIntelligent infrastructure asset dashboard
PRODUCTSTHREE MODULES
PRODUCT 01

PipeRisk AI

Probability and remaining life失效概率及剩餘壽命

Which assets deserve attention first?哪些資產應優先關注?

  • Time-dependent likelihood, by asset segment按資產分段提供隨時間變化的失效概率
  • Drivers and uncertainty exposed, not hidden清晰呈現影響因素及不確定性
  • Ranked inspection queue on a 12-month horizon提供未來 12 個月的檢查優先次序
PRODUCT 02

GeoGuard AI

Terrain and geohazard monitoring地形及地質災害監測

What has physically changed along the corridor?沿線實際發生了哪些變化?

  • Survey epochs aligned to stable control points以穩定控制點對齊不同時期測量
  • Change ranked against asset criticality按資產重要程度排列變化的優先次序
  • A requested field action behind every flag每項風險標記均對應現場行動要求
PRODUCT 03

AssetWise AI

Risk-based renewal planning基於風險的資產更新規劃

Inspect, rehabilitate or replace — in what order?檢查、修復或更換,應如何排序?

  • Likelihood, consequence, cost and constraints綜合概率、後果、成本及限制條件
  • Scenario comparison under hard safety limits在嚴格安全限制下比較不同情境
  • Annual works plan, with expert sign-off kept編製年度工程計劃,保留專家審批